September 2019 Monthly Meeting

The building envelope is an integral part of architectural expression and is quickly becoming the innovative system utilized to realize carbon emission reduction goals. More and more the building envelope’s roofing, glazing, and waterproofing assemblies include Mass Timber. These assemblies are critical for ensuring durability but challenged to increase envelope performance without creating environmental barrier deficiencies.

June 2019 Monthly Meeting

Water-Resistive Barriers (WRBs) have evolved to serve compound forms and functions. Despite these advances, performance expectations still reflect over-simplistic assumptions and problematical testing methods. Interfaces with modern wall components also remain ill-defined with respect to the WRB’s primary function of liquid water resistance. Industry trends toward component integration have further strained the WRB’s intended role.

May 2019 Monthly Meeting

Sometimes the glass that was part of the building envelope ends up on the street. Nobody is happy. Buildings age and fail when the properties of the materials change. Currently, there is no effective method of determining the design life of materials used in building enclosures. Materials are thus selected based on first cost. This transfers the benefit of lower cost materials to the specifier, but the risk associated with that decision on the building owner. When there is a way to determine the accurate design life, economically efficient materials selection decisions are possible.

April 2019 Monthly Meeting

The Portland Building Enclosure group will be organizing a tour of the in-progress renovation of the Portland Building. The project is located at 1120 SW 5th Ave, Portland, OR 97204. Touring guests will need to check-in, sign-in, and fill out waivers prior to the tour; please congregate under Portlandia at fifteen minutes prior to the tour Thursday, April 4th.

DLR Group and Howard S Wright are working on the new renovation of this iconic building. We ask that guests bring their own PPE, including: 1. Hard hats 2. Vests 3. Pants 4. Shoes w/ankle support 5. Safety glasses.

February 2019 Monthly Meeting

Building owners that maintain facilities must contend not only with the upfront costs of construction, but also with the long-term costs of maintenance and repairs. Often times, there are lessons to be learned about long-term building envelope performance from facilities that are held by the same owner for long periods of time. However, the lessons learned often are not readily available to designers, contractors, and managers when a new building is being designed and built.

January 2019 Monthly Meeting

The materials and systems used in buildings have changed dramatically over time. Understanding how old buildings work from a building science perspective will lead to better maintenance and retrofit decisions. Sarah Gray and David Young will discuss how traditional materials and construction practices managed heat transfer, air flow, vapor diffusion and moisture absorption in old buildings.  We will also discuss how performance can be maintained or improved. Case study examples will illustrate challenges and solutions for old buildings.

December 2018 Monthly Meeting

Sheet metal is a unique roof system choice that continues to evolve into new systems and applications. Metal roofs are gaining market share in both commercial and residential markets. Building owners have a high performance and aesthetic appeal expectation for metal roofs. Along with this evolution come the problems associated with it. This seminar is intended to provide a review of the top ten problems for metal roof designers. This will include a description of the problem, why it may occur, ramifications and how to prevent it through proper design.

October 2018 Monthly Meeting

Multnomah County’s central courthouse was built between 1909 and 1914, when the county had only 250,000 residents and long before modern building code standards for the region’s risk of earthquakes were in place. The new Central Courthouse Project is a swiftly rising, 17-story-structure at Southwest First Avenue and Madison Street, and is slated for completion in the spring of 2020.